(MENAFN – IANS) Ahmedabad, April 27 (IANS) Construction of a 36-metre-high bridge over the Sabarmati River is progressing steadily as part of the Mumbai-Ahmedabad High-Speed Rail (Bullet Train). ..
(MENAFN – IANS) Ahmedabad, April 27 (IANS) Construction of a 36-metre-high bridge over the Sabarmati River is progressing steadily as part of the Mumbai-Ahmedabad High-Speed Rail (Bullet Train). ..