KARACHI – The Federal Minister for Railways Muhammad Hanif Abbasi, Monday, announced that work on the 480 km long Rohri-Karachi track will start in September with an estimated cost of $ 2 billion.
KARACHI – The Federal Minister for Railways Muhammad Hanif Abbasi, Monday, announced that work on the 480 km long Rohri-Karachi track will start in September with an estimated cost of $ 2 billion.